Trammell Crow Co.
has started construction of a 45,000-square-foot office building at 6840 Sierra Center Parkway in south Reno's Sierra Corporate Center.
The two-story building is built on a speculative basis, said Par Tolles, Reno-based area director for Trammell Crow.
"The market and the location are ready for another building," he said.
It's scheduled for summer completion.
Architectural design by Blakely Johnson & Ghusn Inc.will be consistent with other buildings in the Sierra Corporate Center, Tolles said.
Trammell Crow Construction is the general contractor.