NV Energy and Great Basin Transmission South have dedicated the 231-mile long One Nevada Transmission Line, which links the power grids in northern and southern Nevada for the first time.
The line runs from the Harry Allen Generating Station north of Las Vegas to the new Robinson Summit Substation located just west of Ely.