Graduate engineering students at the University of Nevada, Reno inspect damage to a 100-ton, 70-foot-long concrete bridge that was shaken in a live simulation to test new materials, connections and construction techniques with the goal of creating safer structures and quicker rebuilding times following earthquakes.